A temporary maintenance site can be ready to work before it has a grid connection. Technicians still need lighting, tools and test equipment. The OptiTemp® Cube 47 TER gives defence organisations a way to bring stored electricity to those sites and use it as soon as it’s needed.
Designed and manufactured in Finland, the TER47 is a mobile battery energy storage unit with 46 kWh of capacity, 9 kW of continuous output and 11 kW of peak output. It supplies 230 V and 400 V AC power for compatible equipment.
Use stored electricity between generator runs
At a temporary repair site, electricity demand changes throughout the day. Work lights may stay on for hours, while tools draw power for shorter periods. A TER47 can supply those loads from its battery. Where a diesel generator is the available charging source, the battery can keep supplying electricity between generator runs.
Optional generator and solar inputs let teams choose a charging setup that fits the site’s available power sources. Avant Power lists a typical recharge time of around four hours from 10% to 80%, with actual time depending on conditions and temperature.

Manage battery temperature in freezing cold and summer heat
The TER47 is designed to operate from −30 °C to +50 °C. Our OptiTemp® immersion cooling technology surrounds the battery cells with cooling fluid to help maintain a stable temperature. The sealed cooling circuit helps protect the battery from dirt, contaminants and condensation, while the design supports quiet operation.
We develop and manufacture the battery modules in Finland. Ballistic protection is available as an option.
Start with a mobile unit and plan for larger power needs
A single TER47 can serve a temporary workshop or service area. For larger sites, multiple units can be connected in parallel. Where a site also needs to coordinate generation, storage and electricity use, our OptiGrid microgrid brings those functions together under one control system. That gives planners options for both temporary power and longer-term energy resilience.
Planning power for a temporary workshop or a site with limited grid access? Tell us what equipment you need to run, how long it needs power and which charging sources are available. We’ll help you find a configuration that fits.